Town of Sun Prairie

Dane County, Wisconsin

Last verified September 17, 2026

Town of Sun Prairie is a jurisdiction in Dane County, Wisconsin, with an online portal for searching and pulling active or historical building permits. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Certificate Holder Mailing Address

Jim Trebian, General Engineering Company
Phone: 608-742-2169 (GEC main line)
Email: jtrebian@generalengineering.net

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

A legally distinct, separate government from the City of Sun Prairie above (both in Dane County) — do not confuse. Building inspection is contracted to General Engineering Company; inspector Jim (James) Trebian holds office hours Mondays 10-11am or by appointment. WI DSPS delegated list gives the municipal clerk contact as Kay Weisensel (608-837-6688) and the inspector contact as James Trebian, General Engineering-Insp, 608-742-2169, gec@generalengineering.net; the town's own website instead publishes Trebian's individual email jtrebian@generalengineering.net. Town office: 5556 Twin Lane Road, Marshall, WI 53559. Effective 7/1/2024, permits are no longer required for replacing water heaters, softeners, or furnaces/AC units.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Sun Prairie's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →