Garfield Township
Kalkaska County, Michigan
Last verified September 17, 2026
Garfield Township is a jurisdiction in Kalkaska County, Michigan, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Contact
Permit Search
No online permit database on file — contact the department directly by phone or email.
Certificate Holder Mailing Address
Garfield Township466 West Sharon Road Southeast
Fife Lake, MI 49633
Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Additional Notes
Zoning Administrator David Martin, direct phone 231-632-3253, per the township's own official site. Township office is open limited hours (Tuesdays 8:00am-1:00pm per the homepage). Who issues the actual building (as opposed to zoning/land-use) permit was not explicitly stated on the site; many small Michigan townships route building/electrical/mechanical/plumbing trade permits through the State of Michigan LARA/Bureau of Construction Codes (michigan.gov/bcc) as several neighboring 'Garfield' townships in this batch do, but this was not directly confirmed for Kalkaska County's Garfield Township -- treat as an unconfirmed hedge. CAUTION: web search results for this township were repeatedly and incorrectly contaminated with contact details (Dennis Albert, Dave Kovar) that actually belong to Garfield Township, Mackinac County -- those numbers were excluded here after direct verification of garfieldtwsp.com itself.
What You Need Before Applying for a Permit
Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Garfield Township's department (above) can confirm exactly what applies to your project.
Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.
More in Kalkaska County
See Kalkaska County property and court records →
Other building permit jurisdictions in Kalkaska County: