Town of Spring Lake
Pierce County, Wisconsin
Last verified September 17, 2026
Town of Spring Lake is a jurisdiction in Pierce County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Contact
Permit Search
No online permit database on file — contact the department directly by phone or email.
Certificate Holder Mailing Address
Joshua Melstrom, Melstrom Inspections (Building Inspector)480-261-9014, jmelstrominspect@gmail.com
Town Clerk: Donna Borgschatz, PO Box 178
Spring Valley, WI 54767
Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Additional Notes
Confirmed via Pierce County's town page and DSPS's UDC delegated-authority PDF (Town of Spring Lake, Pierce County, DOA code 47028, line 1172: Clerk Donna Borgschatz, Inspector Joshua Melstrom). New home construction requires Town Board approval (written description submitted to townofspringlake@wwt.net or PO Box 178) before the building permit itself is applied for.
What You Need Before Applying for a Permit
Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Spring Lake's department (above) can confirm exactly what applies to your project.
Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.
More in Pierce County
See Pierce County property and court records →
Other building permit jurisdictions in Pierce County:
- Village of Bay City
- Town of Clifton
- Town of Diamond Bluff
- Town of El Paso
- Village of Ellsworth
- Town of Ellsworth
- Village of Elmwood
- Town of Hartland
- Town of Isabelle
- Village of Maiden Rock
- Town of Maiden Rock
- Town of Martell
- Town of Oak Grove
- Village of Plum City
- City of Prescott
- City of River Falls
- Town of River Falls
- Town of Rock Elm
- Town of Salem
- Village of Spring Valley