Town of Clifton
Pierce County, Wisconsin
Last verified September 17, 2026
Town of Clifton is a jurisdiction in Pierce County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Contact
Permit Search
No online permit database on file — contact the department directly by phone or email.
Certificate Holder Mailing Address
Todd Dolan, All Croix Inspections Corp.1810 Crestview Drive 1C
Hudson, WI 54016
Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Additional Notes
Building permits for the Town of Clifton (Pierce County) are issued through the Town, with construction inspections handled by its contracted UDC inspector, All Croix Inspections Corp. (named inspector: Todd Dolan, per the WI DSPS statewide delegated-municipality list, updated 8/19/2026). Town Clerk Kris Johnson is a contact for permit paperwork/Town Board approval: the DSPS list gives 715-426-0760, while the Pierce County-hosted town page gives a different number, 715-577-6328 (email in both: townofcliftonclerk@gmail.com) — both phone numbers are included here as a hedge since the two official sources disagree. A separate Pierce County Land Use Permit is also required via the Pierce County Zoning Department (715-273-6746). Applications are approved by the Town Board on the first Tuesday of each month.
What You Need Before Applying for a Permit
Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Clifton's department (above) can confirm exactly what applies to your project.
Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.
More in Pierce County
See Pierce County property and court records →
Other building permit jurisdictions in Pierce County: