Town of Lebanon

Waupaca County, Wisconsin

Last verified September 17, 2026

Town of Lebanon is a jurisdiction in Waupaca County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Certificate Holder Mailing Address

Town of Lebanon Town Hall
N5844 Buelow Road
New London, WI 54961

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

DISAMBIGUATION: this is the Town of Lebanon in WAUPACA County (townoflebanon.wi.gov) — confirmed distinct from the unrelated Town of Lebanon in Dodge County (lebanondodgewi.gov) covered separately above. Confirmed via the town's own official website: the Forms and Permits page lists a 'Building Permits' application but does not name a specific building inspector or department contact beyond the general Clerk's office, so all inquiries route through the Clerk. Wisconsin DSPS's UDC Delegated Municipalities list (line 767) confirms this town holds 'Delegated' UDC authority but leaves the Municipality Contact and Inspector fields blank (unlike the Dodge County Lebanon entry, which does name a clerk/inspector), so no separately-named building inspector could be confirmed for this town. No online permit portal was found.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Lebanon's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →