City of Clintonville

Waupaca County, Wisconsin

Last verified September 17, 2026

City of Clintonville is a jurisdiction in Waupaca County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Certificate Holder Mailing Address

Stephanie Potter, MSA Professional Services (DSPS-listed UDC Inspector)
Alternate/prior contact: John Lust, Kunkel Engineering Group

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

Per the WI DSPS statewide delegated-municipality list (8/19/2026), Clintonville's official UDC municipality contact is City Administrator Caz Muske (715-823-7600, cmuske@clintonvillewi.org) and its UDC Inspector of record is Stephanie Potter of MSA Professional Services (608-617-5691, spotter@msa-ps.com). Note, as a hedge: several independent web sources (city RFP records, third-party listings) describe building inspection services as contracted to Kunkel Engineering Group / John Lust, with office hours Tuesday & Thursday 9:00-11:30am at City Hall, phone 920-210-6351, email jlust@geo-logic.com -- this may reflect a prior or concurrently-used arrangement alongside the DSPS-listed MSA contact; both are included since sources disagree. Zoning Administrator line: 715-823-7601. City Hall: 50 10th Street, Clintonville, WI 54929.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — City of Clintonville's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →