Free Soil Township

Mason County, Michigan

Last verified September 17, 2026

Free Soil Township is a jurisdiction in Mason County, Michigan, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Certificate Holder Mailing Address

Free Soil Township Zoning
7808 N. Custer Rd
Free Soil, MI 49411

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

Confirmed via the township's own official site (freesoiltownship.org): Zoning Administrator/Enforcer Adam Kozicki, reachable at 231-464-5424 / adamkozicki@hotmail.com (a personal-looking email address, but it is what the official township site itself lists). Township Hall drop box: 2691 E Michigan Street, Free Soil, MI 49411 (no mail receptacle); Supervisor mailing address 3289 E Free Soil Road; Clerk mailing address PO Box 148. Actual building/electrical/mechanical/plumbing permits (as opposed to zoning/land-use approval) are reportedly issued through the Mason County Building Department (231-757-9345, located at the Mason County Airport) per a secondary/county-level lead - this delegation was not independently confirmed via a direct official Mason County page fetch in this research session, so treat as a hedged lead. This is a distinct government from the Village of Free Soil above - do not merge.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Free Soil Township's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →