Town of Hansen
Wood County, Wisconsin
Last verified September 17, 2026
Town of Hansen is a jurisdiction in Wood County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Contact
- Phone
- 715-569-4750
- hansenclerk@gmail.com
- Department Site
- Town Clerk (Diane Kohls) (opens in a new tab)
Permit Search
No online permit database on file — contact the department directly by phone or email.
Certificate Holder Mailing Address
Dan Hansen, Central Wisconsin Bldg Inspections LLC715-347-7866 / owendanhansen@gmail.com
7777 Hetze Rd
Milladore, WI 54454
Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Additional Notes
DSPS UDC Delegated Municipalities list confirms Delegated status (DOA code 71016) but lists no contact there. Confirmed via the Wood County Official Directory (2025-2026, hosted on the town's own site): Clerk Diane Kohls, 5846 Cty Trk C, Vesper, WI 54489, 715-569-4750, hansenclerk@gmail.com; Building Inspector is Dan Hansen of Central Wisconsin Bldg Inspections LLC, 7777 Hetze Rd, Milladore, WI 54454, 715-347-7866, owendanhansen@gmail.com (note: inspector's surname 'Hansen' is coincidental and unrelated to the town's name).
What You Need Before Applying for a Permit
Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Hansen's department (above) can confirm exactly what applies to your project.
Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.
More in Wood County
See Wood County property and court records →
Other building permit jurisdictions in Wood County: