Town of Maplehurst
Taylor County, Wisconsin
Last verified September 17, 2026
Town of Maplehurst is a jurisdiction in Taylor County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Contact
- Phone
- 715-678-2089
- clerk.maplehurst@gmail.com
Permit Search
No online permit database on file — contact the department directly by phone or email.
Certificate Holder Mailing Address
Amber Larson, ClerkN744 Hamm Dr, Owen, WI 54460 (clerk mailing)
Town Hall: N373 County Rd T, Withee, WI
Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Additional Notes
IMPORTANT HEDGE: the Town of Maplehurst does NOT appear anywhere in the current Wisconsin DSPS UDC delegated-municipality PDF (checked exhaustively -- towns alphabetically before and after it, 'Maple, Douglas County' and 'Marathon, Marathon County', are both present, but Maplehurst is absent). This suggests the town may not hold delegated UDC inspection authority, meaning the state (DSPS) itself may perform UDC inspections there rather than a locally/county-designated inspector -- this delegation status is unconfirmed and should be verified directly with the town or DSPS before relying on it. Clerk contact info sourced from Taylor County's town directory page.
What You Need Before Applying for a Permit
Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Maplehurst's department (above) can confirm exactly what applies to your project.
Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.
More in Taylor County
See Taylor County property and court records →
Other building permit jurisdictions in Taylor County:
- Town of Aurora
- Town of Browning
- Town of Chelsea
- Town of Cleveland
- Town of Deer Creek
- Town of Ford
- Village of Gilman
- Town of Gilman
- Town of Goodrich
- Town of Greenwood
- Town of Grover
- Town of Hammel
- Town of Holway
- Town of Jump River
- Town of Little Black
- Village of Lublin
- Town of McKinley
- City of Medford
- Town of Medford
- Town of Molitor
- Town of Pershing
- Village of Rib Lake
- Town of Rib Lake
- Town of Roosevelt