Village of Reddick

Livingston County, Illinois

Last verified September 17, 2026

Village of Reddick is a jurisdiction in Livingston County, Illinois, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Certificate Holder Mailing Address

Historic Courthouse
112 W. Madison Street
Pontiac, IL 61764

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

IMPORTANT CAVEAT: Multiple sources (Wikipedia and other search results) describe Reddick as located primarily in Kankakee County (Norton Township), with only a small portion extending into Livingston County -- this appears to be a genuine, documented complication with the given county value, not a research failure. Per the input, Livingston County is used as given/authoritative, and its confirmed official Regional Planning & Zoning office (phone 815-844-7741, email bmiller@livingstoncountyil.gov, Historic Courthouse, 112 W. Madison St., Pontiac, IL 61764) is recorded above, but this office may not actually have jurisdiction over Reddick's village center if it sits in the Kankakee County portion. A separate, unconfirmed (third-party-only) figure for a 'Reddick Village Hall' at 104 W. Lincoln St., PO Box 54, Reddick, IL 60961, phone (815) 365-4035, could not be verified against any official .gov domain and is flagged here only as a hedge, not a confirmed fact. Recommend direct verification with both Livingston and Kankakee counties.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Village of Reddick's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →