Village of Ullin

Pulaski County, Illinois

Last verified September 17, 2026

Village of Ullin is a jurisdiction in Pulaski County, Illinois, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department.

Contact

Permit Search

No online permit database on file — contact the department directly by phone or email.

Additional Notes

No official Village of Ullin website could be located (checked; only Facebook, MapQuest, and directory listings exist). Hedge: a federal OSHA.gov inspection record for the 'Village Of Ullin - Fire Dept' lists an address of 125 Railroad Street / PO Box 187, Ullin, IL 62992 with Mike DeWitt as Village President - an official federal source, but about the fire department, not building permits, so not recorded as permit contact info. Confirmed Pulaski County, Illinois's official site (pulaskicountyil.net) has no zoning/building-department page at all - this small, sparsely populated downstate county does not appear to maintain a countywide zoning/building office (unlike the similarly-named but unrelated Pulaski County, Indiana, which was checked and excluded per disambiguation rules). No confirmed building-permit authority found for this village at either the village or county level.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Village of Ullin's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →