Village of Yuba
Richland County, Wisconsin
Last verified September 18, 2026
Village of Yuba is a jurisdiction in Richland County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Contact
- Phone
- 608-343-1548
- clerk@villageofyuba.gov
Permit Search
No online permit database on file — contact the department directly by phone or email.
Certificate Holder Mailing Address
James Ueeck, Village Clerk24137 Nob Lane
Hillsboro, WI 54634
Treasurer: John McCollam, 608-332-3813, treasurer@villageofyuba.gov
Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Additional Notes
DSPS delegated-authority list (line 1771) confirms Village of Yuba, Richland County (DOA 52196), Delegated status, but leaves both Municipality Contact and Inspector fields blank in the PDF. Clerk identified independently as James Ueeck, 24137 Nob Lane, Hillsboro, WI 54634, phone 608-343-1548, email clerk@villageofyuba.gov; Treasurer is John McCollam, 608-332-3813, treasurer@villageofyuba.gov. Per Richland County's own official directory, the Village of Yuba (Wisconsin's smallest incorporated municipality, population ~53) does not currently have its own website — hedge, permitDeptUrl left null; the Richland County clerks directory (co.richland.wi.us/clerks.shtml) is the best available official reference. No named UDC building inspector was found — hedge, left null.
What You Need Before Applying for a Permit
Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Village of Yuba's department (above) can confirm exactly what applies to your project.
Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.
More in Richland County
See Richland County property and court records →
Other building permit jurisdictions in Richland County:
- Town of Akan
- Town of Bloom
- Village of Boaz
- Town of Buena Vista
- Village of Cazenovia
- Town of Dayton
- Town of Eagle
- Town of Forest
- Town of Henrietta
- Town of Ithaca
- Village of Lone Rock
- Town of Marshall
- Town of Orion
- City of Richland Center
- Town of Richland
- Town of Richwood
- Town of Rockbridge
- Town of Sylvan
- Village of Viola
- Town of Westford
- Town of Willow