Village of Bagley

Grant County, Wisconsin

Last verified September 17, 2026

Village of Bagley is a jurisdiction in Grant County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Certificate Holder Mailing Address

Susan Rose-Adametz, Clerk/Treasurer
115 S. Bagley Ave, Box 116
Bagley, WI 53801

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

Village's Building Permits page states permits are issued by Paul Ketterer (608-778-1063, kettererp@outlook.com), with inspections by Bradley Smrcina, Smrcina Inspections LLC (PO Box 94, Mt Sterling, WI 54645; cell 608-799-6229; bsmrcina@centurytel.net). However, the separate Village Officials & Contacts page instead lists Michael E. Parrott, Director of Inspection Services at General Engineering Company (916 Silver Lake Drive, PO Box 340, Portage, WI 53901, 608-742-2169), as the Building Inspector. This discrepancy between two official village pages could reflect a recent change of contracted inspector; both are disclosed as a hedge — verify current inspector before relying on either. Village Clerk/Treasurer: Susan Rose-Adametz, 608-996-2195, villageofbagley@gmail.com. Note: a separate, unrelated Town of Bagley exists in Oconto County — not to be confused with this Grant County village.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Village of Bagley's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →