Town of Milton
Rock County, Wisconsin
Last verified September 17, 2026
Town of Milton is a jurisdiction in Rock County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Contact
- Phone
- (608) 868-2465
- clerk@townofmiltonrcwi.gov
- Department Site
- Town Clerk — Marcy Granger (opens in a new tab)
Permit Search
No online permit database on file — contact the department directly by phone or email.
Certificate Holder Mailing Address
Marcy Granger, Clerk/Treasurer(608) 868-2465 / clerk@townofmiltonrcwi.gov (also townofmilton@charter.net per DSPS)
23 First St.
Milton, WI 53563
Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Additional Notes
Confirmed via the Town's current official website (townofmiltonrcwi.gov, a Munibit-hosted site). WI DSPS Delegated UDC list (entry #889, Town of Milton, Rock County) lists the same clerk, Marcy Granger, at the same phone but with an older email (townofmilton@charter.net) — the newer official-site email above is likely current; both are plausible/valid so this is flagged rather than silently dropped. No separate building inspector name is published; permits appear administered through the Clerk's office. IMPORTANT: distinct from the City of Milton (also Rock County) and from the unrelated Town of Milton in Buffalo County — do not conflate any of the three.
What You Need Before Applying for a Permit
Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Milton's department (above) can confirm exactly what applies to your project.
Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.
More in Rock County
See Rock County property and court records →
Other building permit jurisdictions in Rock County:
- Town of Avon
- City of Beloit
- Town of Beloit
- Town of Bradford
- Town of Center
- Village of Clinton
- Town of Clinton
- City of Evansville
- Village of Footville
- Town of Fulton
- Town of Harmony
- City of Janesville
- Town of Janesville
- Town of Johnstown
- Town of La Prairie
- Town of Lima
- Town of Magnolia
- City of Milton
- Town of Newark
- Village of Orfordville
- Town of Plymouth
- Town of Porter