Town of LeRoy

Dodge County, Wisconsin

Last verified September 17, 2026

Town of LeRoy is a jurisdiction in Dodge County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Certificate Holder Mailing Address

Linda Schraufnagel, Town Chair
Town of LeRoy
N10725 Hwy YY
Lomira, WI 53048

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

Wisconsin DSPS's UDC delegated-authority list shows the Town of LeRoy as 'Delegated', with Town Chair Linda Schraufnagel (920-948-4714, chair@townleroy.com) as the municipal contact of record. Separately, the town's own FAQ page states that Dodge County Land Resources and Parks Dept (920-386-3700; Terry Ochs, Manager of Code, 920-386-3711) issues building/zoning permits for the town, and Rob Froh of Kunkel Engineering (920-356-9447) handles inspections — this may cover general zoning/land-use permits distinct from, or in coordination with, the UDC dwelling permit. Confirm which office applies for a given project before applying. Town general phone/address: (920) 583-9599, N10725 Hwy YY, Lomira, WI 53048 (a listed contact email on the town site could not be reliably captured and is not included here).

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of LeRoy's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →