Attica Township

Lapeer County, Michigan

Last verified September 17, 2026

Attica Township is a jurisdiction in Lapeer County, Michigan, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Certificate Holder Mailing Address

Attica Township Hall
4350 Peppermill Road
Attica, MI 48412

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

Zoning Administrator Jerry Fackler's direct email is zoning.atticatownship@gmail.com. The township's own official site states building permitting is delegated to the Construction Code Authority, 1075 Suncrest Dr Ste A, Lapeer, MI 48446, phone (810) 667-0420 (also reported as 810-724-8128 on the township page itself), fax (810) 667-2952. Office hours for the zoning administrator: Monday & Thursday 9am-1pm.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Attica Township's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →