Town of Wrightstown

Brown County, Wisconsin

Last verified September 18, 2026

Town of Wrightstown is a jurisdiction in Brown County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Certificate Holder Mailing Address

Ryan Geiger, RG Inspections LLC (UDC Inspector)
920-415-4868 / Rgeiger@rginspectionsllc.com
Town Hall: 1527 Day St, PO Box 175
Greenleaf, WI 54126

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

VERIFIED as a separate government from the VILLAGE of Wrightstown (also Brown County, a distinct entry in this same batch, listed by DSPS as spanning multiple counties) — confirmed via separate DSPS DOA codes, separate officials, and separate websites. DSPS delegated-authority list (line 1363) confirms Town of Wrightstown, Brown County (DOA 05040), Delegated status: Municipality Contact Donna Martzahl, Clerk, 920-532-0607, townclerk@townofwrightstown.org — the phone number was independently corroborated via the town's own site, which is co-hosted with the Village of Greenleaf's site (townofwrightstown.org doubles as 'Town of Wrightstown & Village of Greenleaf'); Town Hall address 1527 Day St / PO Box 175, Greenleaf, WI 54126. UDC Inspector is Ryan Geiger (RG Inspections, LLC), 920-415-4868, Rgeiger@rginspectionsllc.com — the same inspector DSPS lists for the Town of Winchester, Winnebago County, elsewhere in the delegated list, so he appears to serve multiple municipalities.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Wrightstown's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →