Town of Mosel

Sheboygan County, Wisconsin

Last verified September 17, 2026

Town of Mosel is a jurisdiction in Sheboygan County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Certificate Holder Mailing Address

Traci Hermann, Clerk-Treasurer
Town of Mosel
W982 County Road FF
Sheboygan, WI 53083

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

Clerk-Treasurer Traci Hermann, (920) 565-3700, clerktreasurer@moselwi.gov, confirmed via the town's official website moselwi.gov (fax 920-828-8018; office hours Tue/Thu 9:30-11:30am; Deputy Clerk Todd Grunwald, Mon/Wed 9:30-11:30am). Per the town's Permits page, residents must first contact the Clerk-Treasurer for an administrative building permit before entering any construction contract. This town's row in the WI DSPS UDC delegation list (Sept 2026 pull; line 910) had no municipality contact or inspector listed, so a separately-contracted UDC inspector could not be confirmed from that source -- verify the current inspection provider directly with the town. Town Hall: W982 County Road FF, Sheboygan, WI 53083.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Mosel's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →