Village of Boonville

Oneida County, New York

Last verified September 17, 2026

Village of Boonville is a jurisdiction in Oneida County, New York, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Certificate Holder Mailing Address

Kenneth J. Doolittle, Zoning & Codes Enforcement Officer
Village/Town of Boonville
13149 State Route 12
Boonville, NY 13309

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

Zoning & Codes Enforcement Officer is Kenneth Doolittle (term through 12/31/2026); this office appears to jointly serve the Village and Town of Boonville (note the townofboonvilleny.gov email domain used by the village department page). Downloadable Building Permit, Zoning Permit, and Site Plan Approval forms are available; some online form submission is offered, and applications can also be emailed to boonvillecodes@gmail.com. Office at 13149 State Route 12, Boonville, NY 13309; hours Tue/Wed/Thu 8am-12pm; fax 315-338-2889.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Village of Boonville's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →