Center Township
Emmet County, Michigan
Last verified September 17, 2026
Center Township is a jurisdiction in Emmet County, Michigan, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Contact
- Phone
- (231) 348-1735
- Department Site
- Emmet County Planning & Zoning (opens in a new tab)
Permit Search
No online permit database on file — contact the department directly by phone or email.
Certificate Holder Mailing Address
Emmet County Planning & Zoning3434 Harbor-Petoskey Rd, Suite E
Harbor Springs, MI 49740
Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Additional Notes
Emmet County Planning & Zoning administers zoning permits for Center Township (one of the townships without its own separate zoning ordinance), per the county's official site. Note this county department is primarily a zoning/land-use permit office; building-code permit issuance (building/electrical/mechanical/plumbing) for Emmet County townships without their own building department is understood to run through Emmet County Construction Resources or, in some cases, the State of Michigan Bureau of Construction Codes -- this specific arrangement for Center Township was not directly confirmed on an official source and is flagged as unconfirmed rather than omitted. Township Hall itself: 981 W Van Rd, Pellston, MI 49769; Clerk Constance Jordan (231-539-8592), Supervisor William Hutto (231-590-2668).
What You Need Before Applying for a Permit
Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Center Township's department (above) can confirm exactly what applies to your project.
Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.
More in Emmet County
See Emmet County property and court records →
Other building permit jurisdictions in Emmet County: