Town of Lincoln

Burnett County, Wisconsin

Last verified September 17, 2026

Town of Lincoln is a jurisdiction in Burnett County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Certificate Holder Mailing Address

Jenelle Lindquist, Town Clerk
Town of Lincoln (Burnett County)
PO Box 296
Webster, WI 54893

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

BURNETT COUNTY Town of Lincoln, independently verified via the town's own official site (townoflincolnbc.com, self-identifying as Burnett County). Building Inspector Jon Mattson, Atlas Inspections, phone (715) 554-2305 or (715) 648-5444, inspec10u@gmail.com, per the town site; the town notes any new construction requires a permit and inspection. Town Hall: PO Box 296, Webster, WI 54893. Not to be confused with the similarly-domained but county-distinct townoflincoln-wi.com (Polk County) or townoflincolnwc.com (Wood County) sites checked separately in this batch.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Lincoln's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →