Town of Clear Creek

Eau Claire County, Wisconsin

Last verified September 17, 2026

Town of Clear Creek is a jurisdiction in Eau Claire County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Certificate Holder Mailing Address

Carmen Dunham
Clerk, Town of Clear Creek

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

Downloadable Building Permit, Fireworks Permit, and Driveway Access Permit forms are posted on the town's Forms & Permits page; contact is by appointment through Clerk Carmen Dunham. Per the Wisconsin DSPS UDC-delegated-municipalities list (Aug 19, 2026) her phone is listed as 715-533-3245 and email cdunham@riverland.org, while the town's own website separately displays 715-523-2173 for scheduling appointments — both numbers are included as a hedge, since they may represent different lines or reflect a transcription variance between sources. This town's DSPS entry shows 'Opt-Out' status, but per the DSPS document's own definition that Opt-Out applies only to the separate Camping Units delegation (SPS 327.06), not to the underlying dwelling/UDC building-permit delegation, which this town holds. No UDC inspector name was listed for this town in the DSPS dataset; recommend calling to confirm the current contracted inspector.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Clear Creek's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →