Town of Neshkoro

Marquette County, Wisconsin

Last verified September 17, 2026

Town of Neshkoro is a jurisdiction in Marquette County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Certificate Holder Mailing Address

Tim Tripp, UDC Inspector (General Engineering – Inspection), per County of Marquette
Phone: 608-742-2169 Email: gec@generalengineering.net
c/o Town of Neshkoro Town Hall, W698 County Road DD
Neshkoro, WI 54960

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

Verified as a distinct government from the Village of Neshkoro. Confirmed directly on DSPS delegated-authority PDF (line 931): Town of Neshkoro, Marquette County, DOA code 39016, status 'Delegated', Municipality Contact Cheryl Milbrandt (Clerk) matches town-site phone exactly, Inspector explicitly listed as 'See County of Marquette'. Marquette County's own DSPS entry (line 197) lists Jean Potter, Zoning Administrator, 608-297-3036, jpotter@co.marquette.wi.us, and UDC Inspector Tim Tripp (General Engineering – Inspection), 608-742-2169, gec@generalengineering.net — provided in certHolder fields as the actual building inspector of record for this town.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Neshkoro's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →