Town of Dellona

Sauk County, Wisconsin

Last verified September 17, 2026

Town of Dellona is a jurisdiction in Sauk County, Wisconsin, with an online portal for searching and pulling active or historical building permits. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Certificate Holder Mailing Address

Dennis Butteris, Building Inspector
General Engineering Co. (GEC)
Phone: (608) 617-1216

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

Building Inspector is Dennis Butteris with General Engineering Co. (GEC). The personal email shown on the town's own site is Cloudflare-obfuscated and could not be extracted reliably; the email listed here is GEC's general company address seen elsewhere in official Sauk County records for this firm -- treat as a plausible but not fully confirmed direct address. Town Clerk Lynn Eberl, 608-253-7490, clerk@townofdellona.com (per DSPS delegation record), and plan reviewer Dave Bieno (GEC), 608-742-2169, GECPlanReview@generalengineering.net, are also official contacts. Town office: E8062 Highway H, Lyndon Station, WI 53944.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Dellona's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →