Town of Rush River

St. Croix County, Wisconsin

Last verified September 17, 2026

Town of Rush River is a jurisdiction in St. Croix County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Certificate Holder Mailing Address

Tony Feuerhelm, TF Inspection Agency LLC
715-386-5410 / tfiagency726@gmail.com
726 E Highway 12, Ste 105
Hudson, WI 54016

Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.

Additional Notes

Per the DSPS delegated-authority list, UDC building inspection is delegated to Tony Feuerhelm / TF Inspection Agency LLC, 715-386-5410, tfiagency726@gmail.com; Town Clerk of record is Sandi Hazer, 612-759-1030, sandihazer@gmail.com. A search snippet referencing the town's 'Town Personnel' page corroborates TF Inspection Agency as the current inspector (an older page for the same town separately referenced 'REM Inspecting LLC / Daniel Kegley' as a prior inspector — treat that as superseded, not current). Town Hall: 2008 Cty Rd N; mailing address 1829 30th Ave, Baldwin, WI 54002; general email info@townofrushriver.org. NOTE: the town's own website (townofrushriver.org) was unreachable (connection refused/timeout) during this research session, so the town-personnel details above rely on the DSPS document plus cached search-engine snippets rather than a direct current fetch — recommend re-confirming by phone before relying on this for time-sensitive matters.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Rush River's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →