Eveline Township
Charlevoix County, Michigan
Last verified September 17, 2026
Eveline Township is a jurisdiction in Charlevoix County, Michigan, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department, or the mailing address if the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Contact
Permit Search
No online permit database on file — contact the department directly by phone or email.
Certificate Holder Mailing Address
Charlevoix County Department of Building Safety13513 Division St.
Charlevoix, MI 49720
Use this address when the jurisdiction needs to be listed as a certificate holder on a contractor's insurance documentation.
Additional Notes
HEDGE: Eveline Township's own site (evelinetownship.org) blocked automated access (403 Forbidden) in this pass, so its zoning contact could not be verified on an official source. Third-party listings (Yelp/Yellow Pages, not usable as a cited source) give an Eveline Township Zoning office at 11111 Roberts Rd, Charlevoix, MI 49720, phone approx. 231-675-6125, hours 1-4pm — unconfirmed, provided as a lead only. Building permits (as opposed to township zoning) are inferred to run through the county-wide Charlevoix County Department of Building Safety, consistent with neighboring Evangeline Township's confirmed arrangement, but this specific township was not individually named on the county's page.
What You Need Before Applying for a Permit
Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Eveline Township's department (above) can confirm exactly what applies to your project.
Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.
More in Charlevoix County
See Charlevoix County property and court records →
Other building permit jurisdictions in Charlevoix County: