Town of Menomonie

Dunn County, Wisconsin

Last verified September 17, 2026

Town of Menomonie is a jurisdiction in Dunn County, Wisconsin, which does not currently list an online permit database — contact the department directly by phone or email. Use the contact information below to reach the local building department.

Permit Search

No online permit database on file — contact the department directly by phone or email.

Additional Notes

DSPS's UDC Delegated Municipalities list (DOA code 17016) confirms the Town of Menomonie holds UDC delegated authority, but that PDF names no contact/inspector for this line item. The town's own website (townofmenomonie.com) does not publish a named building inspector; it points residents to the Town Clerk and to its Building Permit Ordinance PDF (https://www.townofmenomonie.com/wp-content/uploads/2020/04/BUILDING-PERMIT-ORDINANCE.pdf) for procedure. This Town of Menomonie (Dunn County) is a separate government from the City of Menomonie (also Dunn County, Chief Building Inspector Dave Kowieski, 715-232-2221) and from the unrelated Town of Menominee (Menominee County) — do not conflate. Hedge: inspector identity unconfirmed; contact the Clerk to confirm current arrangement.

What You Need Before Applying for a Permit

Most building departments ask for the same core package before they'll issue a permit: a completed application naming the property owner and contractor, the contractor's state license number and proof of insurance (general liability, and workers' comp if employees are on the job), a notice of commencement or equivalent recorded filing for larger jobs where the state requires one, and scaled plans or a site plan for anything beyond minor repairs. Roofing, fence, pool, and solar permits typically have their own simplified checklists — Town of Menomonie's department (above) can confirm exactly what applies to your project.

Why this matters for insurance: permit history is one of the first things an underwriter or adjuster checks. Unpermitted work — a finished basement, an added bedroom, a rebuilt roof — can complicate a claim or even void coverage for that portion of the loss, and it routinely surfaces during a home inspection. Pulling the right permit up front, and keeping the closed-permit record on file, protects both the property's value and its insurability at resale.

See something out of date? Submit a correction →